AmmLee Group International was tasked with hydroblasting an asphalt drum using 1000 bar at 231 litres per minute.
Challenge
AmmLee was hired for hydroblasting services to unclog an asphalt drum using a tank-cleaning nozzle.
Solution
AmmLee successfully and efficiently cleaned the asphalt drum. The job was completed in less than twelve hours, using only 350 litres of Diesel, whereas with the previous contractors, it could have taken up to two and a half days using 1600 litres of Diesel.
Result
AmmLee successfully unclogged the asphalt drum with hydroblasting in 12 hours with only 350 litres of diesel. The job was more efficient and to a higher standard than previous jobs.