Windfarm Case Study

Hydrodemolition Project

Roadbridge tasked Ammlee Group International to remove defective concrete from the base of a wind turbine with hydrodemolition.

Challenge

Roadbridge had discovered that the windfarm project they had been contracted to build had defective concrete on the base of the wind turbine. AmmLee Group were asked to find the areas of defective concrete and safely remove the concrete with hydrodemolition.

Solution

AmmLee Group identified the areas of concrete that were defective (6m³) and proceeded to safely remove the concrete with the use of hydrodemolition at 2800 of pressure.

Result

AmmLee Group successfully removed the 6m³ defective concrete in 5 x 10 hour shifts allowing Roadbridge to replace the concrete.

Project details

Client: Roadbridge, one of Ireland’s leading civil engineering companies

Location: Ireland

Timeframe: 5 days

If you would like to hire us for hydrodemolition services, please get in touch for a Free, No-Obligation Quote.

Got a question about hydrodemolition services?

Talk to our experts.

Related Projects

Discover our previous projects

Belfast Harbour Project

Hydrodemolition

North East Highlands of Scotland

Hydrodemolition

Island of Ireland Bridge Project

Robotic Hydrodemolition