Hydrodemolition , Ammlee Group was tasked with the removal of “Concrete Cancer” at the Belfast Harbour in order for concrete to be repaired.
Ammlee Group was tasked with underwater HydroDemolition to remove concrete from a dry dock wall seal in the North East Highlands of Scotland.
Ammlee Group was tasked by Roadbridge Windfarm Project to remove defective concrete from the base of a wind turbine using hydrodemolition.
Ammlee Group International was tasked to remove concrete from a bridge on the Island of Ireland using Robotic Hydrodemolition Project.
Ammlee Group International was tasked with hydroblasting an asphalt drum using 1000 bar at 231 litres per minute. The asphalt drum was located in Scotland.
Ammlee Group International was tasked with removing 3 cubic meters of concrete using 30,000 litres of water. Manual Hydrodemolition
Ammlee Group International with were tasked with removing 9m³ of concrete spans on a foot bridge. This hydrodemolition task was entirely done with the Jetframe Nalta 101 at a pressure of 2600bar 30lpm.
Ammlee Group International with were tasked with removing 9m³ of concrete from a column/intersecting beam. The client was located in Epsom Surrey and requested that the job be completed within 8 days.
A client in Teesport needed to inspect the rebar in two openings. However, the openings were filled with concrete, and the client needed a solution to remove the concrete without causing any damage to the underlying structures.