Roadbridge Windfarm Project
Project Details:
Project: Hydrodemolition Project
Client: Roadbridge, one of Ireland’s leading civil engineering companies
Timeframe: 5 days
Location: Ireland
Contract value: --
Client: Roadbridge, one of Ireland’s leading civil engineering companies
Timeframe: 5 days
Location: Ireland
Contract value: --
Roadbridge tasked Ammlee Group International to remove defective concrete from the base of a wind turbine with hydrodemolition.
Challenge
Roadbridge had discovered that the windfarm project they had been contracted to build had defective concrete on the base of the wind turbine. AmmLee Group were asked to find the areas of defective concrete and safely remove the concrete with hydrodemolition.
Solution
AmmLee Group identified the areas of concrete that were defective (6m³) and proceeded to safely remove the concrete with the use of hydrodemolition at 2800 of pressure.
Result
AmmLee Group successfully removed the 6m³ defective concrete in 5 x 10 hour shifts allowing Roadbridge to replace the concrete. If you would like to hire us for hydrodemolition services, please get in touch for a Free, No-Obligation Quote.
Contact Us for a Consultation
If you're interested our services, contact us at 028 9692 7100 for Northern Ireland, 020 7101 3191 for London, or 01642 424685 for Northern England to discuss your project needs and how we can help.




Get in touch
If you're interested in manual hydrodemolition services, contact us to discuss your project needs and how we can help.